The grey-tile bathroom
A tired bathroom taken back to the studs and rebuilt around a tiled shower.
- Area
- Richmond Hill
- Project
- Bathroom renovation
- Programme
- Week by week
- Fixed price
- Quoted in writing
- Finished
- Finished


What they asked for
The old bathroom had to go completely — the owners wanted a proper tiled shower with a linear drain, built to last.
What we built
A full strip-out and reframe, a waterproofed shower with a built-in niche and knee wall, and large-format grey stone-look tile throughout, cut to fall to a linear drain.
How it went
Strip-out and framing first, then waterproofing, then the tile — walls, floor and shower in one run.

“Taken back to the studs, built back properly.”
